SP Energy Networks are consulting on a proposed 132kilovolt overhead line, supported on wood poles, which will replace the existing steel tower line between Annan and Gretna in Dumfries and Galloway, on a different route.
The consultation will run for 30 days between July 11 and August 9. The project information will remain accessible online and available for download beyond this period.
Due to current restrictions relating to Covid-19, no public event is proposed. Instead, the project information can be found online at www.spenergynetworks.co.uk/pages/trouterebuild.aspx
Comments can be sent to the main project mailbox at: [email protected]. Email [email protected] or write to T Route Rebuild Project, Land and Planning Team, SP Energy Networks, 55 Fullarton Drive, Glasgow, G32 8FA.
Please note – Comments at this stage are informal and are made to allow SPEN to determine whether changes to the route are necessary. An opportunity to comment formally to the Energy Consents Unit will follow at a later stage in the process following consultation by the Scottish Government once the application is submitted to them.